Specification guidance for construction
When writing architectural specifications getting the basics in place from the start will help you build a document suitable to your needs. Listed below are some basic rules to follow when writing your next specification:
- Always edit your specification to reflect your appointment and the selected procurement route.
- Always start from a solid baseline document. Do not take the last project you prepared a specification for and change the headers and footers. No matter how vigilant you are, mistakes such as naming the wrong project, specifying incorrect materials and other basic errors will creep into your documents.
- Avoid using the term 'or similar approved' in a specification. If you approve it you are assuming liability for it. Instead use the term ‘or acceptable equivalent’. By accepting an alternative the responsibility for Fitness for Purpose moves to the contractor and the architect's acceptance is for design intent only. If the architect approves, they take back that responsibility. Normally, alternatives are offered for program or cost reasons and the contractor is responsible for the fact that they are providing a different product that must be at least as good quality-wise as the one specified by the architect. If the architect is specifying by description only, the contractor is obliged to provide the technical solution which again they have to be responsible for in terms of quality, performance, appearance and fitness for purpose.
- The proper use of defined terms is important in a specification. Check your contract.
- Document/section identification should appear on every page in the footer for document control purposes.
- Avoid putting specification clause numbers on your drawings. The use of product reference codes is recommended which should all be included on a technical reference sheet (T-Sheet) that links the drawings and the specification. This makes life much easier when changes are required.
- Avoid mixing prescriptive and performance specifications, that is, don’t name a very specific product and then provide performance characteristics for that product – this is not necessary and creates the potential for conflict resulting in claims.
- Avoid specifying temporary works – this is the contractor’s responsibility. Just specify the need to protect adequately, not how to do it.
- Remove names of individuals when specifying products and just provide the company’s details.
- Remove unfinished clauses and terms such as 'if required'. If you are specifying a specific technical solution then you have to specify everything.
- Do not highlight particular clauses by using bold or underlining, as this indicates that the clause is of special importance and there is no such thing in a specification, as by default it indicates that everything else is not so important.
- Always allow time to have your specifications proof-read.
[edit] Related articles on Designing Buildings Wiki
- Bill of quantities.
- Common Arrangement of Work Sections (CAWS).
- Comparison of SMM7 with NRM2.
- Final specifications.
- Insulation specification.
- New Rules of Measurement (NRM)
- Output-based specification.
- Outline specification.
- Performance specification.
- Prescriptive specification.
- Procurement.
- Specification.
- Standard Method of Measurement (SMM7).
- Tender documentation.
- What should be included in a scope of work?
Featured articles and news
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.